One Curzon Street, London W1
A prestigious grade-A 220,000 sq ft office building in the West End of London.
- Date completed: 1998
- Developer: Martin Landau at Development Securities plc for Commerz Grundbesitz Investmentgesellschaft mbH, the real estate fund of German Bank Commerzbank
- Approx value on completion: £180 million
-
The Lanesborough, London W1
A five-star luxury hotel in one of London’s most prominent and desirable locations.
- Date completed: 1991
- Developer: Martin Landau at Imry Merchant Developers
- Approx value on completion: £90 million
-
The Dorchester, London W1
A landmark in innovative construction technology, the Dorchester became the epitome of hotel excellence, respected worldwide, under the direction of the McAlpine family.
In 1991 Sir Robert McAlpine Ltd completed an £85m refurbishment of the hotel which included remodelling each of the 255 rooms along with new hotel facilities such as restaurant, business centre, shopping arcade, nightclub and health club.
- Date completed: (Original contract) 1931. (Refurbishment) 1991
- Developer: Constructed by Sir Robert McAlpine Ltd for Dorchester Hotel Syndicate Ltd (Gordon Hotels / Sir Robert McAlpine Ltd)
- Approx value on completion: (Original contract) £1 million (Refurbishment) £85 million
-
Milton and Shire Houses, London EC2
A 450,000 sq ft office refurbishment project with an innovative approach that enabled expansion of interior dimensions to become the flagship headquarters of a top legal company.
- Date completed: 1997
- Developer: Martin Landau at Development Securities plc with Haus — Invest Commerz Grundbesitz Investmentgesellschaft mbH on behalf of Haus-Invest
- Approx value on completion: £175 million
-
Emirates Stadium, London N5
The 60,000 capacity stadium includes 7000 Club Level seats with adjoining restaurants / bars which can also be used for conferencing and banqueting. The exclusive Diamond Club provides luxurious hospitality accommodation for members, supported by a concierge service. The project was completed ahead of schedule and on budget. (Designed by HOK Sport Architecture and Buro Happold).
- Date completed: 2006
- Developer: David McAlpine, Sir Robert McAlpine Ltd for Arsenal Football Club
- Approx value on completion: £275 million
-
Inn on the Park, London W1 (Now known as Four Seasons)
The 10 storey reinforced concrete structure is externally clad in Portland stone and contains 230 bedrooms with 20 luxury suites providing views over Hyde Park.
- Date completed: 1970
- Developer: Constructed and developed by Sir Robert McAlpine Ltd in conjunction with the Four Seasons
- Approx value on completion: £1.6 million
-
Royal Mint Court, London EC3
A 487,000 sq ft new build office complex incorporating two Grade 2 listed existing buildings on prime six and a half acre site adjacent to Tower Bridge, opposite the World heritage site of the Tower of London.
- Date completed: 1988
- Developer: Martin Landau at Development Securities plc with PosTel and Crown Estate Commissioners
- Approx value on completion: £200 million
-
The Intercontinental, London W1
Overlooking St James’s Park and Hyde Park, the 10 storey reinforced concrete structure is externally clad in Portland stone and provides 540 bedrooms.
- Date completed: 1974
- Developer: Joint development between Sir Robert McAlpine Ltd and Intercontinental. Constructed by Sir Robert McAlpine Ltd.
- Approx value on completion: £8.1 million